Open now · 24 hours, 7 days Licence 299307c 0434 410 612

Renovations & new builds

Renovation plumbing in Sydney, done to the program

Bathrooms, kitchens, laundries and new builds.
Rough in and fit off, coordinated around your tiler and cabinetmaker so nobody is waiting on anybody.

  • $0 call out fee & free quotes
  • 24 hours, 7 days, public holidays
  • Price agreed before we start
  • 5.0 stars from over 50 Google reviews
  • Licensed plumber, drainer & gasfitter
  • Angelo answers the phone himself

Get a plumber out today

Fill this in and Angelo will call you right back.

Or call 0434 410 612 · answered 24 hours

$0Call out fee
60 minTypical arrival
5.0 ★50+ Google reviews
24/7Angelo answers

What we get called for

What we fix, and how?

Bathroom renovations Rough in before the waterproofer, fit off after the tiler. The plumbing decides the program on a bathroom, which is why it is worth booking early.
Kitchen renovations Sink, dishwasher, filtered water and the gas cooktop, set out to the cabinetmaker’s drawings rather than guessed at.
Laundry and ensuite additions New wet areas where there were none. Waste, vent, water and floor waste all have to go somewhere that works.
Moving a toilet or a waste The decision people make casually and pay for twice. We will tell you what it actually involves before it is on a drawing.
New builds and extensions From the main at the boundary through to fit off, with the inspections and certificates as you go.
Strata and multi-unit work Renovating one lot inside a building, where the common stack decides what is possible.

Call 0434 410 612

The work

What the plumbing on a renovation actually is

Renovation plumbing is two visits with three other trades in between, and the order is not negotiable. Nine things make up almost every bathroom, kitchen or laundry we do.

Set outMarking on the floor and the walls exactly where every waste, tap and fixture lands, against the designer’s drawings and the cabinetmaker’s. Half an hour that prevents the most expensive mistake on this page.
Rough inAll the pipework inside walls and floors: water, waste, vent and gas. It happens before lining, before waterproofing and well before tiling.
Pressure testingThe rough in is tested and left under pressure before anything is covered. Finding a weeping joint now costs nothing. Finding it through a tiled wall costs the wall.
Floor wastes and fallsWhere the water goes and how the floor is graded to get it there. This is the thing that decides whether a shower drains properly for twenty years.
Fit offAfter the tiler. Taps, mixers, toilets, vanities, sinks, the dishwasher and the cooktop, connected, tested and adjusted.
GasCooktops and any relocated gas point, by a licensed gasfitter, with the compliance certificate. No second trade needed.
Hot waterWhether the existing unit can carry a second bathroom, and whether the tempering valve needs replacing while the wall is open.
RelocationsMoving a toilet, a waste or a stack. Technically possible, frequently expensive, and worth costing before it goes on a drawing rather than after.
CertificatesCompliance paperwork for the gas and anything else that requires it, handed over at the end rather than chased.

Warning signs

When a renovation is heading for trouble

Most renovation plumbing problems are visible weeks before they become expensive. These are the ones worth acting on.

  • Nobody has marked the set out on the floor before rough in
  • The waterproofer is booked before the plumbing has been pressure tested
  • The cabinetmaker’s drawings and the plumber’s understanding do not match
  • You are being told a toilet can be moved without anyone looking under the floor
  • The tiler is waiting on the plumber, or the plumber on the tiler, and nobody is coordinating
  • Nobody has checked whether the hot water system can carry a second bathroom
  • In a unit, nobody has established where the common stack runs
  • Fixtures have been bought before the plumber has seen the drawings

How we work

Working around the other trades

The plumbing is rarely the hard part. Turning up at the right point in somebody else’s program is.

Drawings first, earlySend them before anything is booked. Most problems we see were decided on a drawing and could have been fixed there for nothing.
Dates the program can hang offYou get the rough in and fit off dates up front, because every other trade on the job is sequenced around them.
We talk to the trades directlyTiler, waterproofer, cabinetmaker, electrician. On a direct job you should not be relaying messages between us.
Tested before it is coveredPressure test at rough in, photographed, so there is a record of what is behind the wall.
Back when we saidFit off happens when the tiling is done, not a fortnight later. A finished bathroom you cannot use is still an unfinished bathroom.
One licence covers itPlumber, drainer and gasfitter. Nothing on the job waits for a second trade to be found and booked.

What to expect

How the job runs

  1. 1 Look at the drawings, then quoteFree, and done from the actual scope rather than guessed at over the phone. This is where relocations get costed honestly.
  2. 2 Set out and rough inMarked, installed, pressure tested and photographed before anything covers it.
  3. 3 Other trades do their bitWaterproofing and tiling. We are off the job and the dates for coming back are already fixed.
  4. 4 Fit off and certificatesFixtures in, everything tested and adjusted, compliance paperwork handed over, site left clean.

What it costs

How a renovation gets priced

Quoted from the drawings, not over the phone. Four things move it and three of them are decided before anyone picks up a tool.

Whether anything movesFixtures staying roughly where they are is a straightforward job. Relocating a toilet or a stack is a different number entirely.
What is under the floorTimber floor with access underneath is one thing. A concrete slab that has to be chased is another.
Number of wet areasOne bathroom, or a bathroom plus an ensuite plus a laundry. Each has its own rough in and fit off.
What compliance requiresA tempering valve, an upgraded hot water connection or new venting may be required by the standard rather than by us.

Our pricing promise

  • No call out fee to come out and look at the drawings
  • The quote is free whether you go ahead or not
  • A fixed price from the scope, agreed before work starts
  • Rough in and fit off dates given up front
Call 0434 410 612

Before you start

Decide these early, leave these to us

A renovation goes wrong in the planning far more often than in the building. These are the calls worth making before anyone turns up.

Decide before rough in

  • Where every fixture goes, marked on the floor, not just on a drawing
  • Which taps and mixers you are using, because wall mounted and deck mounted rough in differently
  • Whether the shower is a niche, a hob or level entry
  • Whether you want a second bathroom now or the pipework left for one later
  • Whether the cooktop is gas or induction, because one needs a gas point and the other does not
  • Where the washing machine and the dishwasher are going

Leave to us

  • Pipe sizing, venting and falls
  • Whether the existing hot water system can carry what you are adding
  • What a relocation actually involves under the floor
  • Tempering valves and anything else compliance requires
  • Talking to the tiler and the waterproofer about timing
  • Whether what the designer has drawn is actually buildable

Call 0434 410 612

The expensive mistake

Why set out is the whole job

Nearly every renovation plumbing disaster we are called to fix is the same one. A waste or a tap ends up somewhere slightly different to where the cabinetry, the vanity or the screen expects it, and nobody notices until the tiling is finished.

Fifty millimetres is enough. A basin waste that lands behind a drawer unit, a mixer that is too close to a corner to turn, a floor waste just outside the fall of the shower. On the day of rough in, each of those is a thirty second conversation. After waterproofing and tiling, it is a wall out, a new sheet of waterproofing, a tiler back, and tiles from a different batch.

So we mark it out on the floor and the walls, against the drawings, and we would rather you stood there and looked at it. You will spot something that no drawing shows, because you are the one who will use the room.

The other half of the same point is relocations. Moving a basin is minor. Moving a toilet means a new waste with enough fall, which can mean chasing a slab or re-routing to a stack. People decide it casually at the design stage because on a plan it is a line moving two metres. It is worth getting that costed before it is on a drawing, not after you have fallen in love with the layout.

Setting out sewer and stormwater on a new build

What Sydney says

Every review below is on our Google Business Profile. None of them are edited.

5.0 ★★★★★ from over 50 Google reviews
L
Lance RedgraveLocal Guide, 19 reviews · 5 months ago
★★★★★ Google review

Can't recommend Angelo at Cesco Plumbing highly enough. We'd been dealing with a leaking basin tap for ages, and other plumbers had quoted us thousands to fix it. Angelo came in and provided a super cost-effective repair that solved the problem properly. He also organised a leak detection service to help us pinpoint the source of another tricky leak we couldn't track down. His service, expertise, and pricing are hard to beat. Absolutely would recommend to anyone looking for an honest, skilled plumber.

T
TawlaLocal Guide, 104 reviews · 10 months ago
★★★★★ Google review

We hired Cesco plumbing recently to do some repair works at our warehouse. Apart from doing a great job, the three things that really impressed me were: 1) they arrived on time 2) they cleaned up after themselves 3) they quoted honestly saving my business thousands compared to our other quotes. Thanks Cesco. Highly recommended!!

R
Rachel Bulmer6 reviews · 9 months ago
★★★★★ Google review

Absolutely fantastic service! Angelo and his Apprentice were prompt, professional, and completed the gas compliance thoroughly and quickly for my new home. I highly recommend Cesco for any plumbing or gas needs!

Read all reviews on Google

Questions

Before you call

When should I book the plumber in a renovation?

Before the waterproofer, not after. Plumbing rough in has to be finished and tested before anything is sealed or tiled, so the plumber is one of the first trades in, not one of the last.

What is rough in and fit off?

Rough in is the pipework inside walls and floors, done before lining and tiling. Fit off is the taps, toilets and fixtures afterwards. Two separate visits with other trades between them.

Can I move the toilet?

Usually, but it is the single most expensive thing you can change in a bathroom. The waste needs fall, and once you are chasing a slab or re-routing a stack the cost is not comparable to moving a basin.

Do you work to the designer’s drawings?

Yes, and we would rather see them early. Set out marked on the floor before rough in is what stops a vanity waste coming up in the wrong place.

Who coordinates the trades?

On a full renovation your builder does. On a direct job we talk to the tiler, the waterproofer and the cabinetmaker ourselves, because waiting on a plumber is the most common reason a bathroom runs late.

How long is a bathroom out of action?

Depends on the scope, and on how long waterproofing and tiling take between our two visits. We tell you the plumbing dates, and they are the ones the rest of the program hangs off.

Do I get compliance certificates?

Yes, on everything that requires one, including the tempering valve and any gas work. Keep them with the house papers because a buyer will ask.

Can you supply the fixtures?

Either. Supply your own and we will fit them, or we can supply. If what you have chosen has no parts available down the track, we will say so before it goes in.

What goes wrong most often?

Set out. A waste or a tap that ends up fifty millimetres from where the cabinetry expects it. It is cheap to prevent before rough in and expensive to fix after tiling.

Do you do new builds from scratch?

Yes. From the connection at the boundary through drainage, water, gas and fit off, with the inspections at each stage.

Can I renovate a bathroom in a unit?

Usually, within limits set by the common stack and your by-laws. What is possible depends on where the stack runs, and that is worth establishing before a designer draws anything.

How much does renovation plumbing cost?

It is quoted from the drawings and the scope rather than estimated over the phone. No call out fee to come and look, and the quote is free whether you go ahead or not.

Where we work

All of Sydney, from the Northern Beaches to the Sutherland Shire

Every corner of the city, from the beaches to the Shire. Ring and we will tell you straight away how long we will be.

  • Inner West
  • Sydney CBD & Inner City
  • Eastern Suburbs
  • North Shore
  • Northern Beaches
  • Northern Suburbs & Hills
  • Western Sydney
  • St George & Sutherland
  • South West Sydney

We cover all of Sydney, including the CBD, Alexandria, Sydney Olympic Park, the Northern Beaches and the Eastern Suburbs, through to the Sutherland Shire. We do not cover the Illawarra.

Suburb by suburb

Contact us

Want to speak to Angelo?

He answers his own phone, day or night. No call centre, no message bank, no waiting until Monday. If it can hold until the morning, send the form instead and he will ring you back.

0434 410 612

Text Angelo

  • Hours 24 hours, 7 days, public holidays included
  • Email [email protected]
  • Areas All of Sydney, from the Northern Beaches to the Sutherland Shire

Send an enquiry

For anything urgent, call. The form is for jobs that can wait until the morning.

Or call 0434 410 612 · answered 24 hours

Call 0434 410 612 24 hours · $0 call out fee Text Angelo